WENS Meridian
shankarpally · Plotted Development
A 32-acre HMDA-approved plotted development on the Mokila–Shankarpally road, released in three phases.
- Land area
- 32 acres
- Units
- 248 plots
- Configurations
- 167 – 600 sq.yd
- Launch
- March 2023
- Completion
- December 2026
- RERA
- [TO BE CONFIRMED]
- Type
- Plotted Development
About this project
Meridian is the largest plotted scheme WENS has taken from land assembly through to registration. The holding was aggregated from eleven separate owners over fourteen months, with the title chain on each parcel reconciled and cleaned before the layout application was filed. The infrastructure specification is deliberately ahead of the market for this corridor: 40-foot internal roads with 60-foot spines, underground electrical, piped water to every plot boundary and a stormwater network sized for the catchment rather than for the minimum sanction requirement. Phase one sold out within nine months of release. Phase two is currently open, and phase three is scheduled for release once the eastern access road is complete.
On site
Amenities and infrastructure
- 40 ft internal roads, 60 ft spine road
- Underground electrical distribution
- Piped water to every plot boundary
- Stormwater drainage network
- Avenue plantation on all internal roads
- Compound wall with two gated entries
- Clubhouse — 8,000 sq.ft
- Children’s play area and open gym
- Jogging track — 1.2 km
- 24×7 security with CCTV coverage
shankarpally
Ask about WENS Meridian
Availability, pricing, documentation or a site visit — tell us what you need and we will come back within one working day.
Have a real-estate opportunity?
Whether you have land, capital, a project, a property to sell — or simply need help figuring out what to do next — let's talk.